Recent Jobs For United Fire & Water

Commercial Business

August 3, 2020 | Baton Rouge, LA

set up 23 fans, 2 dehumidifiers, and 2 air scrubbers. Building flooded and soaked carpet. Made 2ft drywall cut. drying out. took 3 days of continuous running of machines. All dry.

Commercial Business

July 29, 2020 | Madisonville, LA

setup equipment 4 fans, 1 net. air and 1 DH, this will be a 2 to 3 day dry time. demoed entire bathroom due to water damage. complete remodel.

Tiffany D.

July 29, 2020 | Madisonville, LA

inspected carpet found wet in multiple locations. added 8 fans, 1 air scrubber and 1 dehumidifier. removed all carpet from living room and 12" flood cut on drywall in living room .

Matthew W.

July 14, 2020 | Madisonville, LA

set up 2 neg. Air and 2 DH, on this job, been going for 8 days and we still have high readings in entire house. due to humid weather. 8 more days and entire house is dry.

Sherman S.

June 23, 2020 | Holden, LA

There will be lots of demos. Setting equipment and stabilizing the project. 13 fans, two negative real fans, and two dehumidifiers the remaining of the demo should be completed this afternoon. we use 15 fans, 2 DH and 2 net. air fans. There were a 3 day time Some demo. all dry and beautifully remodled.

Rose E.

June 23, 2020 | Port Allen, LA

We will be removing the countertop, the vanity, and 3x7 drywall and cleaning everything. Master Bathroom, clean everything mold. Vanity 1: We remove the countertop, vanity, and 3x7 drywall and clean everything for mold. Bath 1, We are removing 3x4 drywall clean everything for mold. We will use two fans, 2 DH and 2 ...

Beth M.

June 15, 2020 | Baton Rouge, LA

started, put in a DH and neg. Air. all of the wood flooring is 100% wet in the kitchen and living room with water running out the back onto the porch, flooring and baseboards need to come out ASAP and possibly cabinets.

Inga K.

June 10, 2020 | Baton Rouge, LA

There is mold on the drywall and mold on the floor. Also, setting out containment. Putting Visqueen out on the sheetrock and the flooring. Added a dehumidifier and a air scrubber. Removed flooring. everything was dry, and equipment was picked up.

Betty P.

June 9, 2020 | Baton Rouge, LA

We set up 2 fans, 1 Dehu, 1 Airscrubber. dried for 3 days, and everything is dry. wood flooring needed to be replaced. the homeowner chose a very nice bamboo flooring to replace the old buckled flooring.

Keith T.

June 2, 2020 | Baton Rouge, LA

we have some ceiling wet and I pulled out information, put in two fans, one neg.air fan and one DH the drying will be 2 to 3 days. a few more days and everything is dry. no drywall had to be removed.

Lawanda J.

May 19, 2020 | Walker, LA

demo bedroom closet and bathroom closet and set up 1 dehumidifier and 2 fans, and 1 air scrubber. dried for 3 days and then replaced all drywall.

Stephanie S.

May 18, 2020 | Walker, LA

We pulled out , master bath vanity 21.9lf., base 13.6lf. 3 doors trim only. MBR 12lf. Base 1 door trim lam. Floor 60lf. Master closet base 37lf. 1 door trim. dried for a few days and dried out nicely. We did a full remodel and homeowners love it.

Casey E.

May 11, 2020 | Greenwell Springs, LA

set up 5 fans 1 dehumidifier 1 air scrubber took moisture readings. probably be a 3-day dry time we put on insulation withdrawing ceilings and walls no baseboards or plates wet

Chris H. Slab Leak- water damage-

May 7, 2020 | Denham Springs, LA

Throughout the restoration process in Denham Springs, LA, we focused on precision and thoroughness. A total of 12 linear feet of cabinets and 5 linear feet of baseboard were removed, along with the countertop, to mitigate water damage and microbial growth risks. Using state-of-the-art drying equipment, we monitored moisture levels closely, ensuring ...

Mike M.

April 29, 2020 | Baton Rouge, LA

United Fire & Water sent a professional to review the issue. They determined it was not caused by a slab leak. The UF&W pro confirmed there was a leak behind the bathtub. They set up drying equipment including a dehumidifier, air scrubber, and an air mover. After the leak was ...

Total: 751