December 22, 2020 | Lake Charles, LA
During the inspection, it was noted that one area of the sill plate was still wet, with a moisture reading of 27. The team determined that this area would need further attention, as excessive moisture in the sill plate could lead to structural issues if not properly dried. Additionally, some of ...
December 3, 2020 | Lake Charles, LA
In the upstairs Office Gym, moisture readings were high in one of the walls, prompting UFW to set up additional drying equipment. To address the moisture in this area, one dehumidifier and two air movers were placed to ensure effective drying. Given the extent of the moisture readings and the ...
November 11, 2020 | Denham Springs, LA
To mitigate the water damage in this Denham Springs, LA, property, we set up five dehumidifiers, three air movers, and three air scrubbers to expedite drying and improve air quality. Mitigation efforts included the removal of all lower cabinets, the carpet, and the padding in the affected areas. These steps ...
November 11, 2020 | Lake Charles, LA
To address the moisture issue, UFW deployed three dehumidifiers, three air movers, and one air scrubber to help dry out the affected areas. This equipment is expected to run for seven days to fully eliminate excess moisture from the interior, preventing further damage and the growth of mold or mildew. ...
November 6, 2020 | Zachary, LA
Upon further inspection, we identified potential issues with the fireplace that required special attention. The area around the fireplace would need to be cut to ensure all water damage was addressed and to prevent future problems. The ceramic tile in the kitchen and the laminate flooring in the living room ...
November 5, 2020 | Mandeville, LA
To mitigate the water damage in Mandeville, our team implemented a specialized drying process that included forced air ducted into the ball feeders of the bowling alley. This innovative approach allowed us to dry the concealed areas effectively. Additionally, axial fans were positioned strategically to establish negative air pressure, ensuring ...
October 21, 2020 | Baton Rouge, LA
scope of work completed: Unit 8 remove tub surround in the bathroom (all marble pieces should come off in one piece). Remove mold-contaminated sheetrock. The Kitchen cabinets share a wall with the bathroom and were damaged; these must be removed as well. remove sheetrock behind cabinets. Apply antimicrobial and clean accordingly. ...