Recent Jobs For United Fire & Water
April 6, 2021 | Mandeville, LA
To effectively manage the restoration process in Mandeville, a containment area was established to separate the hallway from the rest of the home before any further demolition was conducted. One dehumidifier was removed from the hallway to optimize airflow, and a negative air fan was put in place prior to ...
March 30, 2021 | Gonzales, LA
The leaking firewall required immediate attention to minimize moisture spreading into the apartment. Using advanced moisture detection equipment, we identified the extent of the water penetration and applied proven drying techniques to remove excess moisture. Our approach ensured that the integrity of the firewall was preserved, preventing additional damage and ...
March 24, 2021 | Madisonville, LA
Pulled baseboards in the master bedroom and found heavy growth behind them. 2’ flood cut will need to be made. Customer did not want us to cut out her drywall, but once I explained the situation when she got there, she said we can go ahead. We set a dehumidifier, but ...
March 19, 2021 | Denham Springs, LA
To ensure thorough drying of the Denham Springs, LA, property, we set up dehumidifiers and fans to manage the moisture levels and control the environment effectively. Despite a secondary leak causing additional moisture in the carpet and padding, we worked efficiently to extract the water and dry the materials. The ...
March 8, 2021 | Acadia, LA
All wet flooring was removed in the living room along with baseboards. Flooring removed in the kitchen as it was continuous and a trip hazard if not removed. Contents were moved to get flooring up. Set one dehu and one air scrubber. No fans were set due to possible asbestos ...
March 4, 2021 | Gonzales, LA
To expedite the drying process, we performed a baseboard cut in the laundry room, a critical step to allow airflow and reduce the risk of further water retention. Additionally, we removed the baseboards in the garage to monitor and address the condition of the engineered wood floor. Our advanced drying ...
March 4, 2021 | Zachary, LA
The situation was monitored during a follow-up visit, and we found that the master bedroom was still at 100% moisture level, signaling the need for further action. It was also noted that the fans were unplugged, which had compromised the drying process. To help the customer understand the situation, we explained ...
March 3, 2021 | Gonzales, LA
After extracting the excess water in Gonzales, our team set up advanced drying equipment to effectively address the moisture issue. We deployed dehumidifiers, air movers, and air scrubbers to ensure that all affected areas were dried thoroughly, preventing the likelihood of mold growth and structural damage. Our comprehensive approach to ...
March 1, 2021 | Lake Charles, LA
As part of the restoration process, UFW also took care to remove all hanging lights, ensuring that no debris or moisture was left behind in these areas. This attention to detail helped guarantee that every part of the space was properly cleaned and ready for the next phase of the ...
February 9, 2021 | Gonzales, LA
In response to the water damage in Gonzales LA, our team took swift action to mitigate the effects of the supply line leak. By floating the carpet in the affected areas and strategically placing airmovers and a dehumidifier, we were able to dry out the space efficiently. Our thorough moisture ...
January 20, 2021 | Baton Rouge, LA
Source of water damage is the supply line under the kitchen sink. The hose ruptured and hot water poured out of the cabinet and traveled throughout the kitchen into the dining room. Some water travelled into the small dining area, but the majority went into the formal dining room. Floors ...
January 12, 2021 | New Orleans, LA
In response to the water intrusion, United Fire and Water swiftly mobilized to set up 36 pieces of drying equipment to address the damage and prevent further water from coming in. This included 20 air movers, 10 dehumidifiers, and 6 industrial-grade 2000 air scrubbers. These machines were strategically placed to dry the affected materials and ...
Total: 751