Job completed for Grisby
Completion date: September 13, 2023
Location: Baton Rouge, LA
Why did the customer contact us?
Solutions provided:
2) The walls in the hallway bathroom and the master bathroom have moisture present from the
overflow. Recommend detaching the vanities in both bathrooms for a 1 foot flood cut of
sheetrock behind the vanity
3) Hallway bathroom and Master Bathroom, 1 foot flood cut around the whole bathroom based
on the category of water.
4) Place drying equipment and dry remaining materials
5) Clean and sanitize space and ready for repair.






