Started the drying, put in 11 fans, 2 D.H and neg. Air mover. Some carpet, wood floor, wall, ceiling and trim are wet. dropped ceiling, pulled crown, removed some baseboard. 11 fans 2 DH, 2 neg. Air fans and met system with 3 mets the job dry time were 4 days. We remove some base in upstairs bath and bedroom as nd living room, remove drywall in the bed ceiling and the living room. repaired all drywall and its beautiful.